$7.49 Standard Shipping on all orders
Customer Reviews

OUR INDUSTRY IS EXPERIENCING A MAJOR SHORTAGE OF PRODUCTS DUE TO MANUFACTURER AVAILABILITY
For this reason, we have to limit quantities on some items

Lochinvar

Lochinvar Pool Heater Parts Online

Lochinvar

Lochinvar is the leading producer of energy-efficient boilers, water heaters, pool heaters and commercial
package systems. They focus solely on serving their customers and offer them a product portfolio that
delivers unmatched quality, performance and application flexibility. Lochinvar has a solution for all
your water heating needs.

1/2In X 1/8In Gasket Pipe
1/2In X 1/8In Gasket Pipe
SPECIAL ORDER
3-5 WEEK LEADTIME
110 F Hi Limit Switch
110 F Hi Limit Switch
SPECIAL ORDER
3-5 WEEK LEADTIME
24V Relay/Other Options
24V Relay/Other Options
SPECIAL ORDER
3-5 WEEK LEADTIME
3 Way Valve Actuator
3 Way Valve Actuator
SPECIAL ORDER
3-5 WEEK LEADTIME
Back Left Panel  1441
Back Left Panel 1441
SPECIAL ORDER
3-5 WEEK LEADTIME
Back Left Panel  1801
Back Left Panel 1801
SPECIAL ORDER
3-5 WEEK LEADTIME
Back Left Panel  2071
Back Left Panel 2071
SPECIAL ORDER
3-5 WEEK LEADTIME
Back Panel  1261
Back Panel 1261
SPECIAL ORDER
3-5 WEEK LEADTIME
Back Panel  991
Back Panel 991
SPECIAL ORDER
3-5 WEEK LEADTIME
Back Right Panel  1441-2071
Back Right Panel 1441-2071
SPECIAL ORDER
3-5 WEEK LEADTIME
Bottom Panel Position 1  1441
Bottom Panel Position 1 1441
SPECIAL ORDER
3-5 WEEK LEADTIME
Bottom Panel Position 4  1441
Bottom Panel Position 4 1441
SPECIAL ORDER
3-5 WEEK LEADTIME
Bulbwell
Bulbwell
SPECIAL ORDER
3-5 WEEK LEADTIME
Burner
Burner
SPECIAL ORDER
3-5 WEEK LEADTIME
Burner  Nat W/Pressure Tap
Burner Nat W/Pressure Tap
SPECIAL ORDER
3-5 WEEK LEADTIME
Burner Gasket For Erl401
Burner Gasket For Erl401
SPECIAL ORDER
3-5 WEEK LEADTIME
Bypass Assembly (Asme)
Bypass Assembly (Asme)
SPECIAL ORDER
3-5 WEEK LEADTIME
Bypass Assy Ern (L) 152-402
Bypass Assy Ern (L) 152-402
SPECIAL ORDER
3-5 WEEK LEADTIME
Combustion Fan
Combustion Fan
SPECIAL ORDER
3-5 WEEK LEADTIME
Combustion Fan  201-401
Combustion Fan 201-401
SPECIAL ORDER
3-5 WEEK LEADTIME
Compustible Floor Kit Optional
Compustible Floor Kit Optional
SPECIAL ORDER
3-5 WEEK LEADTIME
Control Board
Control Board
SPECIAL ORDER
3-5 WEEK LEADTIME
Copperfin 992 Directaire
Copperfin 992 Directaire
SPECIAL ORDER
3-5 WEEK LEADTIME
Direct Vent Kit
Direct Vent Kit
SPECIAL ORDER
3-5 WEEK LEADTIME
Drain Valve
Drain Valve
In Stock
Electronic Control
Electronic Control
SPECIAL ORDER
3-5 WEEK LEADTIME
E-Rite Side Wall Vent Kit 252
E-Rite Side Wall Vent Kit 252
SPECIAL ORDER
3-5 WEEK LEADTIME
E-Wall Kit
E-Wall Kit
SPECIAL ORDER
3-5 WEEK LEADTIME
Fan Assembly
Fan Assembly
SPECIAL ORDER
3-5 WEEK LEADTIME
Fan Assembly  Cp1441-2071
Fan Assembly Cp1441-2071
SPECIAL ORDER
3-5 WEEK LEADTIME
Fan Assembly  Cp991-1261
Fan Assembly Cp991-1261
SPECIAL ORDER
3-5 WEEK LEADTIME
Fan Gasket
Fan Gasket
SPECIAL ORDER
3-5 WEEK LEADTIME
Filter
Filter
In Stock
Fitting Hose Bar
Fitting Hose Bar
SPECIAL ORDER
3-5 WEEK LEADTIME
Flame Sensor
Flame Sensor
In Stock
Flange  Water Connection
Flange Water Connection
SPECIAL ORDER
3-5 WEEK LEADTIME
Flow Switch
Flow Switch
SPECIAL ORDER
3-5 WEEK LEADTIME
Flow Switch
Flow Switch
SPECIAL ORDER
3-5 WEEK LEADTIME
Frame End
Frame End
SPECIAL ORDER
3-5 WEEK LEADTIME
Frame Runner  Cp1261
Frame Runner Cp1261
SPECIAL ORDER
3-5 WEEK LEADTIME
Frame Runner  Cp1441
Frame Runner Cp1441
SPECIAL ORDER
3-5 WEEK LEADTIME
Frame Runner  Cp1801
Frame Runner Cp1801
SPECIAL ORDER
3-5 WEEK LEADTIME
Frame Runner  Cp2071
Frame Runner Cp2071
SPECIAL ORDER
3-5 WEEK LEADTIME
Frame Runner  Cp991
Frame Runner Cp991
SPECIAL ORDER
3-5 WEEK LEADTIME
Gas Valve  Lp  Cpl991-2071
Gas Valve Lp Cpl991-2071
SPECIAL ORDER
3-5 WEEK LEADTIME
Gas Valve  Nat  Cpn991-2071
Gas Valve Nat Cpn991-2071
SPECIAL ORDER
3-5 WEEK LEADTIME
Gas Valve Lp Kit
Gas Valve Lp Kit
SPECIAL ORDER
3-5 WEEK LEADTIME
Gas Valve Natural
Gas Valve Natural
SPECIAL ORDER
3-5 WEEK LEADTIME
Gasket  Excutcheon 3/4In Pipe
Gasket Excutcheon 3/4In Pipe
SPECIAL ORDER
3-5 WEEK LEADTIME
Gasket  Header
Gasket Header
SPECIAL ORDER
3-5 WEEK LEADTIME
Gasket  Heat Shield
Gasket Heat Shield
SPECIAL ORDER
3-5 WEEK LEADTIME
Gasket Flange 1 1/2In
Gasket Flange 1 1/2In
SPECIAL ORDER
3-5 WEEK LEADTIME
Gasket Material 45In
Gasket Material 45In
SPECIAL ORDER
3-5 WEEK LEADTIME
Gasket Outdoor Vend 150-300
Gasket Outdoor Vend 150-300
SPECIAL ORDER
3-5 WEEK LEADTIME
Gasket Outdoor Vend 400
Gasket Outdoor Vend 400
SPECIAL ORDER
3-5 WEEK LEADTIME
Gasket Tape Silicone 1/4In X 5/8In
Gasket Tape Silicone 1/4In X 5/8In
SPECIAL ORDER
3-5 WEEK LEADTIME
Gauge  Temperature  Cp991-2071
Gauge Temperature Cp991-2071
SPECIAL ORDER
3-5 WEEK LEADTIME
Header Bronze
Header Bronze
SPECIAL ORDER
3-5 WEEK LEADTIME
Heat Shield Gasket
Heat Shield Gasket
SPECIAL ORDER
3-5 WEEK LEADTIME
Heat Shield Gasket  All
Heat Shield Gasket All
SPECIAL ORDER
3-5 WEEK LEADTIME
Hi Limit Switch  Secondary
Hi Limit Switch Secondary
SPECIAL ORDER
3-5 WEEK LEADTIME
Hi Limit Switch  Secondary
Hi Limit Switch Secondary
SPECIAL ORDER
3-5 WEEK LEADTIME
High Altitude Pressure Switch
High Altitude Pressure Switch
SPECIAL ORDER
3-5 WEEK LEADTIME
Ignition Module
Ignition Module
SPECIAL ORDER
3-5 WEEK LEADTIME
Ignition Module
Ignition Module
SPECIAL ORDER
3-5 WEEK LEADTIME
Ignition Module
Ignition Module
SPECIAL ORDER
3-5 WEEK LEADTIME
Ignition Module Lochinvar
Ignition Module Lochinvar
SPECIAL ORDER
3-5 WEEK LEADTIME
Ignition/Gas Valve
Ignition/Gas Valve
SPECIAL ORDER
3-5 WEEK LEADTIME
Indicator Panel
Indicator Panel
SPECIAL ORDER
3-5 WEEK LEADTIME
Insltn  Front Head Side Panel
Insltn Front Head Side Panel
SPECIAL ORDER
3-5 WEEK LEADTIME
Insltn  Rear-Head Side Panel
Insltn Rear-Head Side Panel
SPECIAL ORDER
3-5 WEEK LEADTIME
Insltn Pad  Front Left  1441
Insltn Pad Front Left 1441
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Back Panel  151
Insulation Back Panel 151
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Back Panel  201
Insulation Back Panel 201
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Back Panel  251
Insulation Back Panel 251
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Back Panel  301
Insulation Back Panel 301
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Back Panel  401
Insulation Back Panel 401
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Bottom Panel  151
Insulation Bottom Panel 151
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Bottom Panel  201
Insulation Bottom Panel 201
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Bottom Panel  251
Insulation Bottom Panel 251
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Bottom Panel  301
Insulation Bottom Panel 301
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Bottom Panel  401
Insulation Bottom Panel 401
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Front Panel  151
Insulation Front Panel 151
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Front Panel  201
Insulation Front Panel 201
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Front Panel  251
Insulation Front Panel 251
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Front Panel  301
Insulation Front Panel 301
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Front Panel  401
Insulation Front Panel 401
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Top  151
Insulation Top 151
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Top  201
Insulation Top 201
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Top  251
Insulation Top 251
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Top  301
Insulation Top 301
SPECIAL ORDER
3-5 WEEK LEADTIME
Insulation  Top  401
Insulation Top 401
SPECIAL ORDER
3-5 WEEK LEADTIME
Ligh Amber
Ligh Amber
SPECIAL ORDER
3-5 WEEK LEADTIME
Ligh Green
Ligh Green
SPECIAL ORDER
3-5 WEEK LEADTIME
Light Red
Light Red
SPECIAL ORDER
3-5 WEEK LEADTIME
Lochinvar Horizontal Direct
Lochinvar Horizontal Direct
SPECIAL ORDER
3-5 WEEK LEADTIME
Lochinvar Pressure Switch
Lochinvar Pressure Switch
SPECIAL ORDER
3-5 WEEK LEADTIME
Low Water Cut Off (Optional)
Low Water Cut Off (Optional)
SPECIAL ORDER
3-5 WEEK LEADTIME
Low Water Pressure Cutoff
Low Water Pressure Cutoff
SPECIAL ORDER
3-5 WEEK LEADTIME
Main Burner
Main Burner
SPECIAL ORDER
3-5 WEEK LEADTIME
Main Burner W/ Pressure Tap
Main Burner W/ Pressure Tap
SPECIAL ORDER
3-5 WEEK LEADTIME
Manual Reset High Limit
Manual Reset High Limit
SPECIAL ORDER
3-5 WEEK LEADTIME
Motor For Cpn0752 Heater
Motor For Cpn0752 Heater
SPECIAL ORDER
3-5 WEEK LEADTIME
100172022 | Natural Gas Valve Kit replaces VAL3412
Natural Gas Valve Kit
SPECIAL ORDER
3-5 WEEK LEADTIME
On/Off Switch
On/Off Switch
SPECIAL ORDER
3-5 WEEK LEADTIME
Orifice  Nat  Cpn991-2071
Orifice Nat Cpn991-2071
SPECIAL ORDER
3-5 WEEK LEADTIME
Orifice  Nat (Green) All
Orifice Nat (Green) All
SPECIAL ORDER
3-5 WEEK LEADTIME
Orifice Nat
Orifice Nat
SPECIAL ORDER
3-5 WEEK LEADTIME
Orifice Natural
Orifice Natural
SPECIAL ORDER
3-5 WEEK LEADTIME
Orifice Natural
Orifice Natural
SPECIAL ORDER
3-5 WEEK LEADTIME
Overlay  Eneryrite Ii Lochinar
Overlay Eneryrite Ii Lochinar
SPECIAL ORDER
3-5 WEEK LEADTIME
Pressure Switch
Pressure Switch
SPECIAL ORDER
3-5 WEEK LEADTIME
Pressure Switch  Nat
Pressure Switch Nat
SPECIAL ORDER
3-5 WEEK LEADTIME
Pressure Switch Kit
Pressure Switch Kit
SPECIAL ORDER
3-5 WEEK LEADTIME
Pressure Tap
Pressure Tap
SPECIAL ORDER
3-5 WEEK LEADTIME
Relay  120Vac
Relay 120Vac
SPECIAL ORDER
3-5 WEEK LEADTIME
Relay/Louver
Relay/Louver
SPECIAL ORDER
3-5 WEEK LEADTIME
Relief Valve  30 Psi
Relief Valve 30 Psi
SPECIAL ORDER
3-5 WEEK LEADTIME
Relief Valve  Pressure Only
Relief Valve Pressure Only
SPECIAL ORDER
3-5 WEEK LEADTIME
Sensor  Dual Immersion  Outlet
Sensor Dual Immersion Outlet
SPECIAL ORDER
3-5 WEEK LEADTIME
Sight Glass Assembly
Sight Glass Assembly
SPECIAL ORDER
3-5 WEEK LEADTIME
Spark Electrode Harness
Spark Electrode Harness
SPECIAL ORDER
3-5 WEEK LEADTIME
Spark Electrode Harness
Spark Electrode Harness
SPECIAL ORDER
3-5 WEEK LEADTIME
Spark Electrode Harness For
Spark Electrode Harness For
SPECIAL ORDER
3-5 WEEK LEADTIME
Spark Wire For Erl252
Spark Wire For Erl252
SPECIAL ORDER
3-5 WEEK LEADTIME
Switch  Air Pressure
Switch Air Pressure
SPECIAL ORDER
3-5 WEEK LEADTIME
Switch Rocker Selector
Switch Rocker Selector
SPECIAL ORDER
3-5 WEEK LEADTIME
Tailpiece Gasket For Er402 Heater
Tailpiece Gasket For Er402 Heater
SPECIAL ORDER
3-5 WEEK LEADTIME
Tekmar 071 Temperature Sensor
Tekmar 071 Temperature Sensor
SPECIAL ORDER
3-5 WEEK LEADTIME
Temp Control With Electronic
Temp Control With Electronic
SPECIAL ORDER
3-5 WEEK LEADTIME
Temperature Control  Digital
Temperature Control Digital
SPECIAL ORDER
3-5 WEEK LEADTIME
TST2301 | Thermostat Bulb Well
Thermostat Bulb Well
SPECIAL ORDER
3-5 WEEK LEADTIME
Thermostat Circuit Board
Thermostat Circuit Board
SPECIAL ORDER
3-5 WEEK LEADTIME
Thermostat Complete
Thermostat Complete
SPECIAL ORDER
3-5 WEEK LEADTIME
Thermostat W/Wiring
Thermostat W/Wiring
SPECIAL ORDER
3-5 WEEK LEADTIME
Time Delay Relay
Time Delay Relay
SPECIAL ORDER
3-5 WEEK LEADTIME
Timer Module
Timer Module
SPECIAL ORDER
3-5 WEEK LEADTIME
Transformer
Transformer
SPECIAL ORDER
3-5 WEEK LEADTIME
Transformer
Transformer
SPECIAL ORDER
3-5 WEEK LEADTIME
Transformer 50 Va
Transformer 50 Va
SPECIAL ORDER
3-5 WEEK LEADTIME
Tubing-Air Pressure
Tubing-Air Pressure
SPECIAL ORDER
3-5 WEEK LEADTIME
Valve  Gas Lpg
Valve Gas Lpg
SPECIAL ORDER
3-5 WEEK LEADTIME
V-Baffle  Cp1261
V-Baffle Cp1261
SPECIAL ORDER
3-5 WEEK LEADTIME
V-Baffle  Cp1441
V-Baffle Cp1441
SPECIAL ORDER
3-5 WEEK LEADTIME
V-Baffle  Cp1801
V-Baffle Cp1801
SPECIAL ORDER
3-5 WEEK LEADTIME
V-Baffle  Cp2071
V-Baffle Cp2071
SPECIAL ORDER
3-5 WEEK LEADTIME
V-Baffle  Cp991
V-Baffle Cp991
SPECIAL ORDER
3-5 WEEK LEADTIME
Vent Harness
Vent Harness
SPECIAL ORDER
3-5 WEEK LEADTIME
Water Pressure Switch
Water Pressure Switch
SPECIAL ORDER
3-5 WEEK LEADTIME

entity.grid.xml.config

entity.grid.xml.config_store.runtime.xml